RPT RQM Adapter uses RTC Workspace directory - Out of sync problem
![]()
Hey Guys,
i'm using the Rational Performance Tester to create component tests which should be automated within RQM. Thus I installed the RPT with the RQM-Adapter on my test system which is installed as a windows service.
My test cases are under version control of the RTC and therefore they need to be checked out on the test system. This is realized by a build engine + definition which performs a check out. This directory is referenced in the workspace of the RPT. Thus it is possible to perform a run of the test cases controlled by the RQM which represents the desired functionality.
The major problem of this solution is when a new check out is done by the build engine. This results in the error that the referenced test cases within RPT are out of sync and cannot be build anymore. The check out and build complete without any issues! The error occurs during the RPT test execution. I personally assume that the workspace of the RPT is loaded and synced only on the startup of the RQM service thus any modification is not recognized....
Best Regards
|