Understanding DOORS Next sizings in ELM 6.x to estimate timings when upgrading to DOORS Next 7.xconstantchange.png

Authors: IanGreen, PaulEllis, VaughnRokosz
Build basis: Engineering Lifecycle Management - DOORS Next 6.x migrating to DOORS Next 7.x

This article is intended to help contextualize your database size relative to IBM's upgrade process testing. It is recommended to make a note of how much storage the database is using for the DOORS Next database both before and after the upgrade.

The article also discusses what tuning is required for your data size, with the assumption of the database administrator (DBA) as a key component in interpreting the advice.

Note: After upgrade, DOORS Next will demand much more resources on the database server and less from the application server due to this re-platforming. DBAs must re-size bufferpools, SGA/PGA sizes to cope with the new workloads, and may also need to amend CPU/RAM resources.

Note: Ensure there is sufficient space for log files, database temporary tables relative to the size of your installation. If you are unsure how to calculate this after reading this and Troubleshooting Upgrades then please contact IBM Support.

Gathering pre-upgrade repository size

In this wiki and jazz.net articles, whenever repository size in DOORS Next is discussed, it is in terms of the total number of artifacts. The 7.0 performance: IBM Engineering Requirements Management DOORS Next details performance expectations post-upgrade, again using the number of artifacts value.

You must take these measurements on the DOORS Next version 6 repository before the upgrade. Execute the following SQL statement and make a note of the results in case you need to share them with IBM. If you run this SQL, it is important to supply IBM Support with all the values, as each value can effect the duration of your upgrade.

Note These SQL queries are not applicable to a 7x DOORS Next repository. Use the queries under the Post-upgrade calculations section below, after upgrading to 7.x.

- Oracle

SELECT 'concepts' AS metric, COUNT(DISTINCT CONCEPT) AS value FROM VVCMODEL_VERSION
UNION ALL
SELECT 'versions' AS metric, COUNT(DISTINCT VERSION) AS value FROM VVCMODEL_VERSION
UNION ALL
SELECT 'configs' AS metric,  COUNT(*) AS value FROM VVCMODEL_CONFIGURATION
UNION ALL
SELECT 'changesets' AS metric, COUNT(*) AS value FROM VVCMODEL_CHANGE_SET
UNION ALL
SELECT 'version mappings' AS metric, COUNT(*) AS value FROM VVCMODEL_VERSION
UNION ALL
SELECT 'resources' AS metric, COUNT(*) AS value FROM RESOURCE_RESOURCE
UNION ALL
SELECT 'resource revisions' AS metric, COUNT(*) AS value
   FROM RESOURCE_RESOURCE res
   INNER JOIN REPOSITORY_ITEM_STATES states
   ON states.ITEM_UUID = res.ITEM_ID
UNION ALL
SELECT 'item states' AS metric, COUNT(*) AS value FROM REPOSITORY_ITEM_STATES

- DB2/SQL Server

SELECT 'concepts' AS metric, COUNT(DISTINCT CONCEPT) AS value FROM VVCMODEL.VERSION
UNION ALL
SELECT 'versions' AS metric, COUNT(DISTINCT VERSION) AS value FROM VVCMODEL.VERSION
UNION ALL
SELECT 'configs' AS metric, COUNT(*) AS value FROM VVCMODEL.CONFIGURATION 
UNION ALL
SELECT 'changesets' AS metric, COUNT(*) AS value FROM VVCMODEL.CHANGE_SET 
UNION ALL
SELECT 'version mappings' AS metric, COUNT(*) AS value FROM VVCMODEL.VERSION 
UNION ALL
SELECT 'resources' AS metric, COUNT(*) AS value FROM RESOURCE.RESOURCE 
UNION ALL
SELECT 'resource revisions' AS metric, COUNT(*) AS value
   FROM RESOURCE.RESOURCE res
   INNER JOIN REPOSITORY.ITEM_STATES states 
   ON states.ITEM_UUID = res.ITEM_ID
UNION ALL
SELECT 'item states' AS metric, COUNT(*) AS value FROM REPOSITORY.ITEM_STATES

How to interpret your values

Until ELM 7.0, the key value to determine the size of your database has been the number of artifacts in your repository. In the 7.0 Performance datasheet for DOORS Next performance during usage is still measured in these terms.

In terms of upgrade, the resource revisions metric and the other metrics above will be of more help than the raw number of artifacts in your repository. The resource revisions number is important as it indicates the number of revisions that the upgrade will need to process. There are also other shapes that could determine the overall size. Your Staging environment upgrade is the most reliable indicator of expected upgrade time.

Sample data points from upgrades

  2.3M IBM Test Server Client A Client B
Repository size 2,300,000 1,897,515 256,615
Concepts 7,884,586 3,414,563 1,241,340
Versions 8,176,219 6,107,958 2,893,997
Configs 46,935 275 5297
Changesets 605,539 1,797,783 646,033
Version Mappings 8,792,972 10,077,175 4,675,924
Resources 10,904,741 10,668,439 11,057,361
Resource Revisions 12,673,763 19,021,273 17,800,441
Item States 22,280,080 31,239,827 23,930,331
AddTables upgrade time 10 hours 17.5 hours 7 hours

Notes:
  • This information is database agnostic.
  • The hardware between the examples were different.
  • This table shows how different measurements can impact the overall upgrade time.
  • As stated in Migration tuning of the repotools JVM, the JVM heap size was set to 16GB, REPOTOOLS_MX_SIZE=16384

The hardware required to achieve the initial 2.3M time, based on that data shape is available in the

DB Server for IBM testing

2 x Intel Xeon E5-2640, 2.5GHz (ten-core):
  • 40 logical processors (hyperthreaded)
  • 64 GB RAM
  • RAID 10 - 15K SAS, disk x14
  • Red Hat Enterprise Linux Server 7.6

RM Server for IBM testing

2 x 2.5GHz (six-core):
  • 24 logical processors (hyperthreaded)
  • 32 GB RAM
  • RAID 5 - SAS, disk x4
  • Red Hat Enterprise Linux Server 7.6
  • WebSphere Liberty, 24GB Heap

Understanding data shape deviations

Large composite changesets

During our upgrade validations, we check to ensure consistency of the changesets that have been delivered. Clients that have used large composite deliveries of changesets may require additional temp dbspace during the upgrade.

Run the following two queries to understand your data shape. The second query relies on the output of the first, so replace the ? (question mark) in the 2nd query with the output of the first.

Run the following queries in the DOORS Next 6.x/7.x environment:

DB: Oracle

SELECT JZ_PARENT_ID, COUNT(JZ_PARENT_ID)
FROM VVCMODEL_CHANGE_SET_MERGED_FRM GROUP BY JZ_PARENT_ID ORDER BY COUNT(JZ_PARENT_ID) DESC;

SELECT CHANGE_SET_ITEM_ID, TARGET_STREAM_ITEM_ID
FROM VVCMODEL_DELIVERED_CHANGE WHERE CHANGE_SET_ITEM_ID = ?;

If your results return multiple entries in excess of 1,000, then you should follow the instructions below for Oracle optimizations.

DB: SQL Server, DB2

SELECT JZ_PARENT_ID, COUNT(JZ_PARENT_ID)
FROM VVCMODEL.CHANGE_SET_MERGED_FROM GROUP BY JZ_PARENT_ID ORDER BY COUNT(JZ_PARENT_ID) DESC;

SELECT CHANGE_SET_ITEM_ID, TARGET_STREAM_ITEM_ID
FROM VVCMODEL.DELIVERED_CHANGE WHERE CHANGE_SET_ITEM_ID = ?;


Monitoring your upgrade

There is an extensive section in this wiki on how to monitor your system during this upgrade, with specific areas to focus on when running your Staging upgrades. Planning your ELM upgrade to version 7.x also contains additional information which may be required when contacting IBM Support. A list of must-gather information is at the bottom of this article.

Migration tuning of the repotools JVM

In terms of the DOORS Next repository, you should only need to amend the following setting in the repotools-rm file from 1500MB to the values below. This is consistent with the Interactive Upgrade Guide. It is only anticipated that you would require 32GB if your repository is on a very large scale. It is not recommended to increase past 32GB and certainly not recommended to create enormous heaps to speed up the upgrade. We found no evidence that larger heap sizes improved performance, beyond 32GB.

We also recommend that you set a file to record the verbose garbage collection information. For more information on setting the verbosegc log, see the WebSphere help document Writing Verbose GC to a Specified Log -Xverbosegclog in AIX, Linux and Windows

Windows example to increase it to 16G and set verbose GC logging:

set REPOTOOLS_MX_SIZE=16384
set VMARGS=%VMARGS% -verbose:gc -Xverbosegclog:c:\temp\verbosegc.log -XX:NumberOfGCLogFiles=100 -XX:GCLogFileSize=20M

Linux example to increase it to 16G and set verbose GC logging:
export REPOTOOLS_MX_SIZE=16384
export VMARGS="$VMARGS -verbose:gc -Xverbosegclog:/tmp/verbosegc.log -XX:NumberOfGCLogFiles=100 -XX:GCLogFileSize=20M

Post-upgrade calculations

It is expected that the post-upgraded DOORS Next database will require approximately 60% -100% more than the storage required for the existing DOORS Next 6.x. You must ensure that the database is suitably configured for this growth.

- Oracle

 SELECT 'resource types' AS metric, COUNT(*) AS value FROM DNGMIGRATION_DB_RESOURCE_TYPE
 UNION ALL
 SELECT 'upgrade mappings' AS metric, COUNT(*) AS value FROM DNGMIGRATION_DB_UPGRADE_MAPPNG
 UNION ALL
 SELECT 'mappings' AS metric,  COUNT(*) AS value FROM REPOSITORY_VERSION 
 UNION ALL
 SELECT 'r.versions' AS metric, COUNT(DISTINCT STATE_ID) AS value FROM REPOSITORY_VERSION
 UNION ALL
 SELECT 'item states' AS metric, COUNT(*) AS value FROM REPOSITORY_ITEM_STATES

- DB2/SQL Server

SELECT 'resource types' AS metric, COUNT(*) AS value FROM DNGMIGRATION.DB_RESOURCE_TYPE
UNION ALL
SELECT 'upgrade mappings' AS metric, COUNT(*) AS value FROM DNGMIGRATION.DB_UPGRADE_MAPPING
UNION ALL
SELECT 'mappings' AS metric,  COUNT(*) AS value FROM REPOSITORY.VERSION   
UNION ALL
SELECT 'r.versions' AS metric, COUNT(DISTINCT STATE_ID) AS value FROM REPOSITORY.VERSION
UNION ALL
SELECT 'item states' AS metric, COUNT(*) AS value FROM REPOSITORY.ITEM_STATES

Tuning the database

This next section details a base set of considerations which apply where database servers are typically installed within the context of ELM-only.

The most significant advice we can give for tuning databases for upgrade is already listed in the Interactive Upgrade Guide, which is to ensure that the database statistics are up-to-date, for example:

Oracle: EXEC DBMS_STATS.GATHER_DATABASE_STATS

DB2: DB2 REORGCHK UPDATE STATISTICS ON TABLE ALL

SQL Server: exec sp_updatestats


Database tuning and guidance

When database servers are part of large database farms, many of these considerations will be redundant. However, it is recommended to discuss with your database administrator (DBA) to determine what values are appropriate within the context of your enterprise setup. This section is not expected to be copied verbatim. These values are specific to the machine size in use and are not appropriate for any database server which is smaller, where you will need to extrapolate relative values.

DB2

When the IBM Performance Engineering team ran the DB2 upgrade of DOORS Next for 7.x, there were some tuning actions performed to the database. This section of the article is a guide for DBAs and not prescriptive, but advisory. We are therefore only covering the DB2 settings that were altered in order to improve performance.

First, we forced DB2 to maximize all the available RAM to the DOORS Next DB Memory as well as its bufferpool size, e.g.:

First, run these three commands as db2admin user prior to the upgrade, to understand your configurations and settings for the current database(s):

$ db2 connect to <DNG_DB>
$ db2pd -dbptnmem
$ db2 get db cfg for <DNG_DB>

replacing to the actual database name.
We recommend that you unset the automatic flag so that STMM (self-tuning) does not reduce the settings inadvertently during migration.

Your sizes could vary depending on the size of the database and the actual RAM available on the system.
Note:

  • We recommend that your BUFFERPOOL during upgrade is 10% of the overall RM database size.
  • That the BUFFERPOOL is 70% of DATABASE_MEMORY,
For example:
500GB RM database -> 50GB BUFFERPOOL (3276800 16KB pages) -> 70GB DATABASE_MEMORY (18350080 4KB pages).


db2 "ALTER BUFFERPOOL IBMDEFAULTBP SIZE 3276800"
db2 "update db cfg for RMDB using DATABASE_MEMORY 18350080"

See the Db2 documentation for calculating memory sizes. If your DBA requires further guidance, contact IBM Db2 Support.
  Then we secured the minimums for the following:

db2 update db cfg using stmt_conc off immediate
db2 update db cfg using APPLHEAPSZ 10000 automatic
db2 update db cfg using LOGFILSIZ 65536
db2 update db cfg using SORTHEAP 28615
db2 update db cfg using SHEAPTHRES_SHR 143077
db2 update db cfg using PCKCACHESZ 32184
db2 update db cfg using STMTHEAP 8000 automatic
db2 update db cfg using AUTO_REORG off

Finally, we altered inline length for LOB data:

alter table REPOSITORY.ITEM_STATES alter column ITEM_VALUE set inline length 2048;
alter table REPOSITORY.CONTENT_STORAGE alter column CONTENT_BYTES set inline length 4096;
reorg table REPOSITORY.ITEM_STATES allow read access longlobdata;
reorg table REPOSITORY.CONTENT_STORAGE allow read access longlobdata;

LOBs during upgrade: LOBs don't use the buffer pool, so that means more I/O is required for their processing. If you are monitoring I/O on the database server, they this can be run later...but it will increase I/O.
If Db2 is running very high-performing disks, then these inline steps are not necessary.

There is more information on these values and how they would be set for production performance in the Db2 Tuning portion of the 7.0 Performance report.

Oracle

This section of the article is a guide for DBAs and not prescriptive, but advisory. We are therefore only covering the Oracle settings that were altered in order to improve performance.

Oracle memory management settings:

automatic memory management
memory_max_target=50000M scope=spfile;
memory_target=50000M scope=spfile;
sga_max_size=0 scope=spfile;
sga_target=0 scope=spfile;
pga_aggregate_limit=0 scope=spfile;
pga_aggregate_target=0 scope=spfile;

It is also important that you ensure that you have sufficient TEMP tablespaces, which have the ability to auto-extend if necessary. Failure to do so will result in a compromised upgrade and likely to require a rollback and re-attempt at the upgrade. Error messages encountered with Oracle servers can be found in Troubleshooting DOORS Next Upgrades.

We recommend turning the following optimizer parameters to false as they make changes to execution plans dynamically, reacting to data that it sees. These settings can lead to upgrade unpredictability since the order in which Oracle processes the data, for example, change sets, will matter. This skews our data, so it is hard for the optimizer to make good decisions. There are two optimizer flags that can make execution plans more stable. Caution: these are system-wide parameters and will impact all the rest of the SQL during the upgrade.

In Oracle 12.1, you would set

  • OPTIMIZER_ADAPTIVE_FEATURES=FALSE
  • _optimizer_use_feedback=FALSE
  • "_complex_view_merging"=FALSE

https://community.oracle.com/tech/developers/discussion/228122/optimizer

In Oracle 12.2 and Oracle 19c, you would set

  • OPTIMIZER_ADAPTIVE_PLANS to FALSE,
  • OPTIMIZER_ADAPTIVE_STATISTICS to FALSE
  • _optimizer_use_feedback=FALSE
  • "_complex_view_merging"=FALSE

Note, "_complex_view_merging" is a hidden parameter, so the double quotes are required. We recommend that this setting is reset after the upgrade:

  • alter system reset "_complex_view_merging"

| Note: If you are unable to apply these settings to your Oracle installation then you will need to control the amount of temp dbspace used during the Phase 3 - Finalisation phase by reducing the amount of threads that run at this time. See: Setting the Foundation threads to reduce temp dbspace consumption.

There is more information on these values and how they would be set for production performance in the Oracle Tuning portion of the 7.0 Performance report.

Considerations for larger imports.

What is considered a large import can be subjective, but in terms of this article it is any migration of data in this manner where new tables are being populated in the database from a Jena data store should treat this as a large import. It is common to increase the number of transaction logs to accommodate such an operation.

  • Increase the log file of the database server. Empirically, our expertise resides with DB2, therefore the following settings are recommended for change in order to unblock the bottleneck of the database server.

   db2 connect to RM7
   db2 update db cfg for RM7 using LOGPRIMARY 120
   db2 update db cfg for RM7 using LOGSECOND -1
   db2 update db cfg for RM7 using LOGFILSIZ 16384


It is important to ensure that your Oracle archive logs are appropriate for a very large transaction that occurs as part of the DNG upgrade to avoid an Oracle DB archive logging full filesystem. See Troubleshooting DOORS Next Upgrades for more on error SQLSTATE: 64000, SQLCODE: 257 which relates to this topic.

Undo tablespace

For large upgrades, and/or where the data may be unusual due to import scripts, OSLC, or any other non-GUI usage then it is recommended that the undo tablespace is monitored and set to autoextend where possible. Read Undo tablespace errors for more details.

Ensure the hard disks in use are optimal.

Solid State Disks(SSD) are recommended for the RM indices location and the database server's log file area. Standard 10k rpm as disk speed is generally insufficient for the read/write access required on very heavily used directories. Use hdparm –tT to track disk speed. The Timing cached reads per second are crucial.

Typically with database servers, the IOPS (I/O per second) is a significant indicator of performance. We recommend that your DBA refer to our article on Disk Benchmarking. This article covers tools that can benchmark the performance of storage systems, and includes some sample results from the IBM labs. The typical methods to calculate the IOPS of the DB server are these benchmarks:

Considerations for Staging comparisons (Must gather)

It is important to size any run in a Staging environment appropriately. The ideal is to use comparable hardware, as well as the same software settings in the application (repotools-rm) and database (as discussed above) to know how long the upgrade will take. If it is not possible to do so, then you should understand the characteristics of your deployment by assessing What to monitor during the upgrade

Related topics: 7.0 performance: IBM Engineering Requirements Management DOORS Next, Planning your ELM upgrade to version 7.0, Oracle 12c Tuning Guide

External links:

Additional contributors: HongyanHuo, MarkGoossen, TimFeeney, WillChatham

Edit | Attach | Printable | Raw View | Backlinks: Web, All Webs | History: r51 < r50 < r49 < r48 < r47 | More topic actions...
 
This site is powered by the TWiki collaboration platformCopyright © by IBM and non-IBM contributing authors. All material on this collaboration platform is the property of the contributing authors.
Contributions are governed by our Terms of Use. Please read the following disclaimer.
Dashboards and work items are no longer publicly available, so some links may be invalid. We now provide similar information through other means. Learn more here.