Is it possible to upgrade the JTS/RTC (v4.0.1) embedded into RAM(7.5.2) to a newer version?
Hi there,
I also have all of their databases (DB2v9.7) on another linux server.
I need to migrate the DB2 from v9.7 to v10.1. Although I've checked this DB2 version is officially supported
by RAM, it is not by JTS/RTC (v4.0.1 only supports DB2 9.5/9.7).
My question is if I could upgrade the JTS/RTC 4.0.1 to 5.0.2/6.0 for example, as you would normally
do it in standalone scenario (without RAM) so that DB2 v10.1 could be used by all 3 components (RAM, JTS & RTC). In case it is possible, would it be through the normal procedure for JTS/RTC alone?
I couln't find any specific similar case in the forum.
Thank you very much for any help you could provide!
|
One answer
Hi, Sergio
If you use embedded RTC, the normally steps should be: 1. Update DB2 from 9.7 to 10.1, this should be always first 2. Open up Installation Manager, update RAM from 7.5.2 to 7.5.2.2 or later 3. Open up RAM setup page, such as http://serverpath:port/ram.setup 4. Go through all the steps. result: RAM is 7.5.2.2, RTC/JTS is 4.0.7, DB2 is 10.1 Thanks. |