Does Unranking a Work Item work in RTC 4.0.6 work?
I have Tasks that were assigned a rank from dragging and dropping them into a different iteration in the Plan View/Work Breakdown Structure. I want the rank removed. The Context Menu of the Work Item has the Remove > Rank option, but it is greyed out. I checked that I have 'modify Rank attribute" pemissions for my role. I can see the option but I can't use it. What is going on?