Are there permissions required to import a work item
I am able to import work items with no issues. One of my developers sent me the csv file he was using to import. It worked fine for me. i had him sign into my eclipse on my vdi and i did the import with the same exact file it did not work. I am getting an error when he does it that says the planned for is not set. It is in the file and i just imported the same file and it worked.
|
One answer
Ralph Schoon (63.5k●3●36●46)
| answered Feb 20 '14, 5:35 a.m.
FORUM ADMINISTRATOR / FORUM MODERATOR / JAZZ DEVELOPER
As far as I can tell, the user trying to import needs the permissions to
Also the operational behavior like required attributes etc. will be taken into consideration, based on the role, target project area/team etc.
|