How I can view resource allocation across project ?


lorenzo tiberi (3112) | asked Mar 12 '13, 6:35 a.m.

If I have a resource allocated on more projects. I don't undestand  how to view the total resource allocation (across projects).

I'm using  RTC 4.0.1.

Accepted answer


permanent link
Erwin Kunz (94687086) | answered Mar 14 '13, 8:50 a.m.
Use BIRT, there is no Widget

you need to connect APT_SNAPSHOT and COMMON_SNAPSHOT

I can send you my xml file if you'd like.  erwin.kunz@siemens.com
lorenzo tiberi selected this answer as the correct answer

2 other answers



permanent link
VK L (8177157159) | answered Mar 12 '13, 8:35 a.m.
 Hi Lorenzo,
                     This is possible using Birt or Insight reporting. Not sure if any direct widget is available in RTC 4.0 for this - You can check the available widgets.

Thanks.

permanent link
lorenzo tiberi (3112) | answered Mar 14 '13, 10:16 a.m.
Thanks Erwin,
we have Publishing Engine for generating report and documents.
I hope that the xml file is suitable in RPE.

tiberilo@posteitaliane.it

regards



Comments
Chris Ryan commented Apr 30 '13, 8:47 a.m.

Does the file also work in RPE, Iorenzo?