How I can view resource allocation across project ?
If I have a resource allocated on more projects. I don't undestand how to view the total resource allocation (across projects). I'm using RTC 4.0.1. |
Accepted answer
Use BIRT, there is no Widget
you need to connect APT_SNAPSHOT and COMMON_SNAPSHOT I can send you my xml file if you'd like. erwin.kunz@siemens.com lorenzo tiberi selected this answer as the correct answer
|
2 other answers
Hi Lorenzo,
This is possible using Birt or Insight reporting. Not sure if any direct widget is available in RTC 4.0 for this - You can check the available widgets.
Thanks.
|
Thanks Erwin,
we have Publishing Engine for generating report and documents. I hope that the xml file is suitable in RPE. tiberilo@posteitaliane.it regards |