Story converted to Epic retains Story Points


Martin Erzberger (131199) | asked Feb 03 '10, 3:48 a.m.
Hello
With RTC 2.0.0.2 Scrum template; I entered a Story and provided an estimate in story points. Later, the Story turned out to be way more complex than originally thought. It was converted to an Epic, and a number of new child Stories were created underneath.

It appears that the Epic now contains an estimate in Story Points (visible in the "Custom" tab). It also appears that these Story points are considered in plans or progress calculation.

-> How can I get rid of these story points? Setting them to "0" doesn't remove the attribute.

Thanks! Martin

2 answers



permanent link
Dr. Hans-Joachim Pross (1.1k4458) | answered Jan 20 '14, 6:05 a.m.
JAZZ DEVELOPER
AFAK, there is no way to remove that attribute. But why is have them 0 pt not enough?

permanent link
Karl Below (11) | answered Sep 24 '15, 8:21 a.m.
 I just have a similar problem, and I also not found a way to remove the attribute.
The only way seems to be to set the value to 0 pts.
But it looks just ugly in the plans. :-( 