Bernd van Oostrum (21735673) | asked Jun 10 '20, 6:43 a.m.

In the process configuration of my project area under "Team Configuration --> Event Handling", I can't activate any follow-up action.


From the past, I remember that at least for "Work Item State Changed Event" follow-up actions existed.

Are they removed in v6061 or did I miss something in my configuration?

Regards,
Bernd.

One answer



permanent link
Ralph Schoon (63.5k33646) | answered Jun 16 '20, 3:08 a.m.
FORUM ADMINISTRATOR / FORUM MODERATOR / JAZZ DEVELOPER
Bernd,

the event handler extension point was always pretty neglected as far as I know. I heard about it being considered to be removed years ago.

I am not aware, if there was actually an eventhandler available to be configured. I looked into RTC 6.0.5 and there was nothing. In 6.0.6.1 there is nothing. If you feel there is something missing that should be there, I would suggest creating a defect.

If the extension point would be removed, I would assume to see some kind of warning in the process editor. I also could not find any announcement about a removal of the extension point.