In DCC collection jobs we have option to reload delta data for previous dates. However the reports such as Burndown are not being updated if we run CCM jobs with detla dates.
How can we update the missing data in WORKITEMS_SNAPSHOT table?
Dashboards and work items are no longer publicly available, so some links may be invalid. We now provide similar information through other means.
Learn more here.
Paste the content from Word into the text box below. Once you are satisfied with the content to insert, press the paste button. To abort inserting text, press the cancel button.
●Paste●Cancel
Insert Image
Enter an image URL or browse to a local file. (2.5Mb max size; .jpg, .jpeg, .gif, .png file types supported).