Timetracking tab and timespent field showing different values in workitem query
HI Everyone,
We are using RTC 4.0.1
We are facing the problem with timespent field and timetracking tab totals. Whenever we try to display the workitems in a query, it gives unassigned value for the timespent field inspite of time filled in timetracking tab.
We have checked the configuration in planning in process configuration for timetracking attribute and all.
Any help will be appreciated.
Regards,
Dnyanesh
|
One answer
Ralph Schoon (63.1k●3●36●45)
| answered Aug 05 '15, 11:27 a.m.
FORUM ADMINISTRATOR / FORUM MODERATOR / JAZZ DEVELOPER
See https://jazz.net/help-dev/clm/topic/com.ibm.jazz.platform.doc/topics/t_sync_timespent_timetracking_ecp.html
I can't test this, but if you run in Time Tracking mode, the time spent attribute is no longer valid (unassigned) because the entries are at the time sheet. You can switch on the synchronization, I am not sure if the attribute is tan set or is still empty and only displays the time from the time sheet entries. |
Your answer
Dashboards and work items are no longer publicly available, so some links may be invalid. We now provide similar information through other means. Learn more here.