Measure time lapsed between two states
Can I measure the time elapsed between two states? (Something which could be used for SLA measures)
When a Work Item changes its state is recorded in its history. Is there any way to recover the time when the Work Item reached a specific state for using later as calculated value (for instance, to perform the difference between two of this dates)?
Any tip about how to reach this goal?
|
Accepted answer
all the reporting is in the RRDI/Insight products Time In State is a standard report as I recall.
the query function in the RTC product is 'what is going on NOW'. Fran Burgos selected this answer as the correct answer
|