Measure time lapsed between two states
Can I measure the time elapsed between two states? (Something which could be used for SLA measures)
When a Work Item changes its state is recorded in its history. Is there any way to recover the time when the Work Item reached a specific state for using later as calculated value (for instance, to perform the difference between two of this dates)?
Any tip about how to reach this goal?