How to transfer requirement documents from one project area to other project area through ReqIF on RRC 4.0.1


Shilpa yhs (538) | asked Apr 02 '15, 4:57 a.m.
Currently we are working on CLM 4.0.1, We have created a new project area on RRC, This project needs the requirements from an other project area on the same application.
Going through jazz.net I found that it can be done through ReqIF, Can anyone guide me on using it on 4.0.1

Accepted answer


permanent link
Donald Nong (14.5k614) | answered Apr 02 '15, 5:51 a.m.
The steps are pretty much the same for all versions.
https://www-304.ibm.com/support/knowledgecenter/SSYMRC_4.0.1/com.ibm.rational.rrm.help.doc/topics/r_reqif_format.html
Shilpa yhs selected this answer as the correct answer