CLM 5.0.2 Upgrade: RM upgrade fails
We run all the steps for the upgrade from 4.0.7 to 5.0.2 related to JTS, RTC and RQM with success.
Running the upgrade for RRC from 4.0.7 to 5.0.2 the steps from [0] to [4] completed successfully but it was displayed the msg "Found 0 project areas"
But the problem is that we have 3 RM projects areas.
Since these project areas are referenced into 3 Lifecycle Project Areas looking inside these last ones we have the message 'Unresolved Context' related to the RM project areas.
What did we wrong?
Thanks, regards
Adriano
Running the upgrade for RRC from 4.0.7 to 5.0.2 the steps from [0] to [4] completed successfully but it was displayed the msg "Found 0 project areas"
But the problem is that we have 3 RM projects areas.
Since these project areas are referenced into 3 Lifecycle Project Areas looking inside these last ones we have the message 'Unresolved Context' related to the RM project areas.
What did we wrong?
Thanks, regards
Adriano
2 answers
You are likely hitting the below known defect:
http://www-01.ibm.com/support/docview.wss?uid=swg21697169
Please try the Diagnosis and see if you got into this problem and the solution provided. if you want to apply 5.0.2 ifix03, it is planned on 6th March:
Comments
Hello Dan,
thanks for replay ... Unfortunately I do not have a backup copy of my JTS database previously of the migration.
I have some doubt regarding how to proceed ... btw. the JTS,CCM and QM upgrade terminated successfully
What I want to do is the following:
Stop all the CLM appl.
1) Drop the RM database
2) Recreate a new copy of the RM database
3) Backup the actual JTS 5.0.2 database (here is my doubt ... Can I use it (do not have the JTS 4.0.7 version)
4) Restore the JTS 5.0.2 database into the new copy of the RM database
5) Mount again the 2 JTS filesystems
6) Run again the rm_upgrade scripts
7) Startup all the CLM appl. (JTS, CCM, RQ and RM) and run the
repotools-rm.sh -rmUpdateProjectBackLinksOnline
Please, could you confirm that I can use the JTS 5.0.2 database to backup/restore into the new RM db before
I proceed with the RM_upgrade steps ?
Thanks in advance
Adriano
thanks for replay ... Unfortunately I do not have a backup copy of my JTS database previously of the migration.
I have some doubt regarding how to proceed ... btw. the JTS,CCM and QM upgrade terminated successfully
What I want to do is the following:
Stop all the CLM appl.
1) Drop the RM database
2) Recreate a new copy of the RM database
3) Backup the actual JTS 5.0.2 database (here is my doubt ... Can I use it (do not have the JTS 4.0.7 version)
4) Restore the JTS 5.0.2 database into the new copy of the RM database
5) Mount again the 2 JTS filesystems
6) Run again the rm_upgrade scripts
7) Startup all the CLM appl. (JTS, CCM, RQ and RM) and run the
repotools-rm.sh -rmUpdateProjectBackLinksOnline
Please, could you confirm that I can use the JTS 5.0.2 database to backup/restore into the new RM db before
I proceed with the RM_upgrade steps ?
Thanks in advance
Adriano