burn-up should on the most basic form deal with story points. as the sprint/iteration goes then each additional story closed adds to the burn-up. ideally at the end of each sprint the team and the product owner can view how much work has been done and (if all of the remaining items in the backlog have been allocated story points) how much remains to be tackled.
if my understanding of the burn-up is not accurate then feel free to correct me.
ciao!