"Plan requirements coverage detail" report with Doors - no results
I've set up an environment with RQM 4.0.1 and Doors WebAccess 1.5.
A testplan was created and linked against Doors requirements.
I did a reconcile and created lots of TCs based on the requirements.
All the TCs were linked to the TP.
I run the DWH jobs three or four time from jts/admin and qm/admin.
They are all marked green in the history view.
I run the "Plan requirements coverage detail", can check the TP where th requirements are linked, but it reports "No result returned" or something like that, I got a "Keine Datensätze für den Bericht zurückgegeben" in German.
The *_etl.log look fine, for rqm and jts.
As shown in https://jazz.net/library/article/1009/ it should be possible to run this report.
What can I do to solve this?
greetings georg.
A testplan was created and linked against Doors requirements.
I did a reconcile and created lots of TCs based on the requirements.
All the TCs were linked to the TP.
I run the DWH jobs three or four time from jts/admin and qm/admin.
They are all marked green in the history view.
I run the "Plan requirements coverage detail", can check the TP where th requirements are linked, but it reports "No result returned" or something like that, I got a "Keine Datensätze für den Bericht zurückgegeben" in German.
The *_etl.log look fine, for rqm and jts.
As shown in https://jazz.net/library/article/1009/ it should be possible to run this report.
What can I do to solve this?
greetings georg.