Tarek ALqaisi (3144) | asked Jul 09 '10, 2:34 p.m.
Hello,
We are using RTC to start the build, and after the build finish and it is good (OK) we would like to start a test suite using RQM.
I configured both servers as per instruction, and IBM documents and they communicate with each other.
I created a Test execution schedule that depends on a given RTC build, and to start the execution if the build is OK.
The problem, RQM starts the test execution schedule before the build is finished.
We have RQM 2.0.1
RTC 2.0.0.2

One answer



permanent link
Andri Lareida (36) | answered Mar 01 '11, 4:22 a.m.
Same problem. The test execution is triggered before the build is complete.

Using:
RQM 2.0.0.1 iFix 5 (I20100328_0509)
RTC 2.0 (I20090618-1753)