RQM Reconcile: How do you think it should work in a version-controlled project area?
If a test case was valid against a requirement and the test case was then edited, should it be automatically declared as valid for that requirement, or should we require an explicit gesture by the user (assuming that this gesture can be made in context, i.e. in the same context where they hit "save").