"Modified Date" field update in workitem
We are using RTC 502. When I change my Summary or discussion or tag attributes in defect work item (in Resolved / Closed state) in Eclipse IDE , the "Modified Date" is not getting updated. I have checked this in "History" tab. It is not reflecting.
If I open the same workitem in webclient (I use Chrome here), if I modify the same attribute again and "save" it, I am seeing the "Modified Date" update in the "history".
Is there is any issue? What basis this "Modified Date" is getting updated?
2 answers
Hi Mohanraj,
Modified Date should work in way for both eclipse and web client if its OTB.
1) Verify and open from the different eclipse workspace
2) Do you have any plugin deployed in the eclipse client, remove and try again.
3) Check do you have any scripts used, remove and try.
Regards,
Arun.
Arun.
HI Arun,
Modified Date is OTB only.
on the other points
1) Same eclipse workspace only we are using. What is the different if we use different workspace?
2) Yes, we have in-house plug-in. But that won't be triggered or invoked in this state transition condition.
3) Yes, this question is based out of the script we are looking for. Basically we want to capture the Modified date as "closed date" in "closed" condition. This is working in Webclient but not in Eclipse client. So the script is not a problem.
Comments
Arun K Sriramaiah
Aug 07 '15, 5:04 a.m.Hi Mohanraj,
Arun.