Standard RTC work item field for Fix Summary?
Our project want to record and document a fix summary for each defect. Is there a standard RTC field that is intended for this purpose? Where does IBM typically log a fix summary for a work item? We know how to add a custom field but we want to use RTC as close to out of the box as possible for ease of setup and maintenance. We suppose we could add a fix summary to the standard description or discussion fields. But we're not sure that makes the fix summary prominent enough or easy enough to find from a consistency standpoint. Thoughts? |
One answer
Ralph Schoon (63.6k●3●36●47)
| answered Sep 10 '13, 1:43 a.m.
FORUM ADMINISTRATOR / FORUM MODERATOR / JAZZ DEVELOPER
Add a custom attribute of type large text. Add a validator script that makes it required to add a certain amount of data to allow to save it in certain states. See https://jazz.net/library/article/1093 Lab 3,4,5.
Comments You can place the important things on a special tab that is up in the list for easy navigation. If the text is no too big, it can also be added to the overview tab. I believe some of the Scrum templates we provide has such data in stories.
|
Your answer
Dashboards and work items are no longer publicly available, so some links may be invalid. We now provide similar information through other means. Learn more here.