Has anyone tried or is it possible to setup a single RQM project that can use requirements from both DOORS and RQM requirements in a single Project Test Plan?

One answer



permanent link
Antoinette Iacobo (650712) | answered Jul 23 '13, 6:12 p.m.
 James,
Are you referring to the DOORS RQMI integration or DOORS OSLC integration with RQM?  