Hi,

I was wondering if it's possible to change the resolution value of a work item without changing its Status.

I'm using RTC 2.0 and when I set a certain Status that has Resolution values available and save it, the Resolution value turns read only and I can't edit it anymore.

But what if the Resolution was wrongly assigned and I want to change it without changing the Status? Is it possible? Are there any workarounds?

Thanks

One answer



permanent link
Lucas Gratz (2124) | answered Feb 13 '13, 10:01 a.m.
Found a topic about it, pretty much the same issue I have.
Apparently there is no solution, I'll try to use a custom field instead of the default Resolution.

https://jazz.net/forum/questions/100972/updating-resolution-without-changing-state