How to deliver the empty baseline using scm tool
In UI, we can see all the baseline even it is empty and can deliver it one by one. Then the INT stream component have the same baseline history as the DEV team.
We want to use script to do this, but if there are more than one baseline in workspace, the UI can show all of them as outgoing, but the scm status only show the latest one as outgoing. So can not deliver the baseline one by one to ensure the INT stream component has the same baseline history.
Please help, thanks!