How to define a new work item type in RTC?
2 answers
On 5/11/2011 12:08 PM, kamalsur wrote:
You can do that in Project Area configuration editors.
Check Jazz.net articles. There are couple about how to do that step by step.
In RTC, how can I define a new Work Item Type (other than the existing
Defect, Task, Story, Epic, etc.)? Is it possible by some configuration
in the UI or is it only through some RTC extension?
You can do that in Project Area configuration editors.
Check Jazz.net articles. There are couple about how to do that step by step.
On 5/11/2011 12:08 PM, kamalsur wrote:
In RTC, how can I define a new Work Item Type (other than the existing
Defect, Task, Story, Epic, etc.)? Is it possible by some configuration
in the UI or is it only through some RTC extension?
You can do that in Project Area configuration editors.
Check Jazz.net articles. There are couple about how to do that step by step.
Thanks!