Linking (blocking) work items..


Jan Van de Poel (2413216) | asked Apr 17 '08, 10:36 a.m.
I have a work item that is blocked by a defect (link-> WI depends on Defect; Link-> Defect blocks WI).

however, it is no problem for me to resolve the workitem without resolving the defect first.

Is this normal behavior? Can I enforce a rule that all the defects that the work item depends on, need to be resolved before I can resolve the work item??

One answer



permanent link
sébastien etter (21687) | answered Apr 18 '08, 2:01 a.m.
I think links between work items are just informative.
But I want what you described too, it could be a great enhancement

Sbastien Etter
Alcatel-Lucent, R&D Effectiveness