Carla Kitsuta (622) | asked Oct 06 '10, 10:44 p.m.
I have a project with one timeline called "Main Development". Inside this timeline one iteration called "Release A". Inside this iteration, two sub-iterations called "sprint 1" and "sprint 2".

This project has two team areas, which have the timeline
set to the "Main Development".

When I open the sprint backlog for "sprint 1", I see each
team member with the user stories planned.
My problem is that the Load bar is only visible to people
who are member of the project, not for members of the team area. What should I do to have the Load bar visible to everybody?

Thanks,
Carla.

One answer



permanent link
Carla Kitsuta (622) | answered Oct 07 '10, 7:20 a.m.
After more reading I figured out my problem. The Sprint
backlog that I was using was the one originally created
which had the project as Owner. I just had to change the
Owner to my team area and it now works.
To sum up, a Sprint backlog is associated to an Owner (team area) and an iteration in a timeline.

I have a project with one timeline called "Main Development". Inside this timeline one iteration called "Release A". Inside this iteration, two sub-iterations called "sprint 1" and "sprint 2".

This project has two team areas, which have the timeline
set to the "Main Development".

When I open the sprint backlog for "sprint 1", I see each
team member with the user stories planned.
My problem is that the Load bar is only visible to people
who are member of the project, not for members of the team area. What should I do to have the Load bar visible to everybody?

Thanks,
Carla.