It's all about the answers!

Ask a question

RTC details in RRC


babu vijay prasad kamineni (7623016) | asked Jun 10 '10, 3:24 a.m.
I have done integration between RQM - RRC - RTC - RQM and RPE - RRC. I have linked a requirement in RRC to a test cases in RQM, workitem in RTC and linked the same work item to some other test cases in RQM and change set(related to Source control). I want to generate traceability report in RRC. In that i want all requirements which are linked and the details of work items too. i.e work item which is linked to test cases(RQM) and change set. Is it possible to get all details in RRC? how?



I am trying to create a separate traceability report template using RPE, so i need to add these details in that.

One answer



permanent link
Robin Bater (3.4k47) | answered Jun 14 '10, 10:38 p.m.
JAZZ DEVELOPER
I have done integration between RQM - RRC - RTC - RQM and RPE - RRC. I have linked a requirement in RRC to a test cases in RQM, workitem in RTC and linked the same work item to some other test cases in RQM and change set(related to Source control). I want to generate traceability report in RRC. In that i want all requirements which are linked and the details of work items too. i.e work item which is linked to test cases(RQM) and change set. Is it possible to get all details in RRC? how?



I am trying to create a separate traceability report template using RPE, so i need to add these details in that.



The RRC Project Page will allow you to show the Requirements, traced to Work Items and Test Cases. These columns can be added once the various RRC-RTC-RQM projects are configured. There is an Out-Of-The-Box RPE trace report that can be run from this view. This might not give you everything you need but using RPE can be used to customize the report.

Your answer


Register or to post your answer.


Dashboards and work items are no longer publicly available, so some links may be invalid. We now provide similar information through other means. Learn more here.