DNG full data load failed - do I have to start over?
We kicked of a full data load for DNG, which had been running for 63 hours. Unfortunately there was a disconnect and the DNG app server was stopped as part of investigation for another issue, therefore the dcc job failed. Can we run a delta load to pick up the rest of the data or do we have to start over with the full data load?
CLM version is 6.0.6