How to make "Links" Mandatory before saving a work item in In "Progress state"


Dastan Ali (17716) | asked Jul 14 '17, 7:15 a.m.

 Hi Team,

 My scenario is that make Links mandatory before saving work item in particular state ex(In Progress).
 Is there any way to achieve this without going for custom extension(Work item save advisor)


Accepted answer


permanent link
Ralph Schoon (63.5k33646) | answered Jul 14 '17, 7:54 a.m.
FORUM ADMINISTRATOR / FORUM MODERATOR / JAZZ DEVELOPER

I don't know a way to do that without creating an advisor.

Dastan Ali selected this answer as the correct answer