 Hi, I have a plan view in the RTC that shows me all WI of my current iteration, but to change te status os this WI I have to enter inside of each one, If I try to select one and move it to another column the plan shows the message: Read-only.

There is a way to change de cards status, I mean from new to inprogress to done for example directly in the plan?
Thanks a lot.

Accepted answer


permanent link
Ralph Schoon (63.1k33646) | answered Apr 19 '17, 3:01 a.m.
FORUM ADMINISTRATOR / FORUM MODERATOR / JAZZ DEVELOPER

There are different plan types and plan display modes. In iteration plans the Kanban and the Taskboard plan view allow to change the work item states via drag and drop. Quick Planner also supports this. Other plan modes don't as they have a different focus e.g. changing the owner and seeing owner load.