How to migrate from data warehouse to DCC in 5.0.2
One answer
Hi Georg,
Do you mean you would like to migrate from Java ETL to DCC when upgrading from CLM 5.0.2 to 6.0.x? As you might know, Java ETL is abolished in 6.0.x, you will need to use DCC to run ETL job (Data collection job) in version 6.0.x.
If my understanding is correct, then there is no specific requirement to migrate it, since both Java ETL and DCC are using the same data warehouse schema. Just ensure to upgrade data warehouse schema to version 6, then you can run DCC 6.0.x for the existing data warehouse.
Comments
Great answer Kenji.
Georg, I would also like to point out that you MUST ensure that your current Java ETL jobs will no longer be running or accessing the Data Warehouse. If those jobs run while DCC is running data corruption can occur.
So, if you have any servers still running v5.0.2 while you have some running 6.0.x you will want to disable all ETL activity.