Could you explain to me how RTC 4.0 calculates the load time
Hello,
I have an iteration which has 1 day long.
I have 1 dev team member who is at 20% for that iteration and has workday length of 8 hours
If I do simple calculation of 20% of 8 hours that gives me 1.6 h available but RTC gives me 1.75h availableSo could some one explain to me how RTC calcules the time available to do work in an iteration?
Thank you.