I have a parent work item, and I can easily go in to the Links tab and add one work item as a child. What do I do if i want to add 37 Tasks as a child to a Business Need? Is this possible. I don't see the modification ability in the query results.

One answer



permanent link
Kevin Ramer (4.5k9186201) | answered Feb 01 '16, 3:17 p.m.
It is possible to add numerous links from the Links tab while editing a single work item.  Either by a text search or by running a query. 