Hi All, 
I look at my Integration stream and it has:

Component1 (59:2015.107.1708)
Component2 (70:2015.107.1512)
Component3 (72:2015.107.1512)

and my build workspace has

Component1 (57:2014-09-19)
Component2 (66:2014.1201.1050)
Component3 (70:2014-09-19)

How can I fix this? Is this a workspace or stream problem?

Accepted answer


permanent link
Lily Wang (4.9k714) | answered Jan 12 '15, 7:09 p.m.
Hi Daniel,
The difference is the baseline of the component. You can accept the latest baselines from "Pending Changes" view manually.

If you use the RTC build definition, when you create the build definition, you need to make the following selection:
- enable "Jazz Source Control" pre-build
- in the "Jazz Source Control" tab, tick "Accept latest changes before loading"
- ensure the build workspace's flow target stream is the integration stream
After that when you start a build, the build workspace will accept all latest changes from the integration stream first, then start build.