Time Remaining Burndown Report


Kevin Zemanek (2454825) | asked Apr 15 '09, 9:15 a.m.
After switching to Time Remaining the burndown report has a Total Estimate line in addition to the Time Remaining line. Is there a report that has Time Remaining but does not have Total Estimate?

- Kevin Z.

One answer



permanent link
James Moody (3.3k24) | answered Apr 21 '09, 12:58 p.m.
JAZZ DEVELOPER
On 4/15/2009 9:18 AM, klzemanek wrote:
After switching to Time Remaining the burndown report has a Total
Estimate line in addition to the Time Remaining line. Is there a
report that has Time Remaining but does not have Total Estimate?

- Kevin Z.


I don't think there is such a report. If you think this should be
optional (i.e. specified by a parameter) please open a work item in the
Reports component.

Thanks,

james
Jazz Reports Team Lead