how does user work load calculate?


Clement Liu (3172) | asked Apr 13 '09, 6:54 a.m.
The user has two tasks assigned in the current iteration

Task1 - 8/16 h
Task2 - 0/32 h

The user work load shows as "Load:0 / 96 | +96 h Estimated:100%"

Why does the upcoming work equal to zero?

One answer



permanent link
Johannes Rieken (1.2k1) | answered Apr 15 '09, 8:11 a.m.

The user work load shows as "Load:0 / 96 | +96 h Estimated:100%"

Why does the upcoming work equal to zero?


The upcoming work is 96h, but the work done is 0h because no task is resolved yet.