how does user work load calculate?
The user has two tasks assigned in the current iteration
Task1 - 8/16 h Task2 - 0/32 h The user work load shows as "Load:0 / 96 | +96 h Estimated:100%" Why does the upcoming work equal to zero? |
One answer
The upcoming work is 96h, but the work done is 0h because no task is resolved yet. |