Unreasonable work load calculation for an iteration.
I have an iternation plan starting from next Monday (Apr. 13) and will end on Apr. 17 (one week iteration). I created a task under this iteration. I found the work load time is calculated based on the time of the task creation (maybe iteration plan creation). My iteration plan is one week duration, working time in total for me should be 40 hours, but the maximum of the workload RTC showed is 56 hours. It obviously added 2-day of the remainding time of this week. I don't think it's reasonable. My plan is designed for next week work, why does it count in the remaining time of this week? Thanks.
- Matt
- Matt
2 answers
mattcui schrieb:
work load. Seems to work correctly.
Have you checked that you have selected the right iteration in Team
Central > Team Load?
Frank.
--
Dr. Frank Gerhardt
Gerhardt Informatics Kft.
Eclipse Foundation member
fg@gerhardtinformatics.com <mailto>
www.gerhardtinformatics.com <http>
SENS-Experte www.SoftwareExperts.de <http>
I'm speaking at EclipseCon 2009
Adam u. 9, 6753 Szeged, Hungary. Registergericht/Domicile and Court of
Registry: Szeged, Hungary. HRB-Nr./Commercial Registery No.:
06-09-010204. Umsatzsteuer-Id/VAT registration number: HU 13592417.
Geschftsfhrer/Managing Directors: Borbala Gerhardt, Szilvia Toth
Kontakt in Deutschland: +49-177-757 8658, Orplidstr. 17, 70597 Stuttgart
I have an iternation plan starting from next Monday (Apr. 13) and will
end on Apr. 17 (one week iteration). I created a task under this
iteration. I found the work load time is calculated based on the time
of the task creation (maybe iteration plan creation). My iteration
plan is one week duration, working time in total for me should be 40
hours, but the maximum of the workload RTC showed is 56 hours. It
obviously added 2-day of the remainding time of this week. I don't
think it's reasonable. My plan is designed for next week work, why
does it count in the remaining time of this week? Thanks.
For me the time of an upcoming interation is not added to the current
work load. Seems to work correctly.
Have you checked that you have selected the right iteration in Team
Central > Team Load?
Frank.
--
Dr. Frank Gerhardt
Gerhardt Informatics Kft.
Eclipse Foundation member
fg@gerhardtinformatics.com <mailto>
www.gerhardtinformatics.com <http>
SENS-Experte www.SoftwareExperts.de <http>
I'm speaking at EclipseCon 2009
Adam u. 9, 6753 Szeged, Hungary. Registergericht/Domicile and Court of
Registry: Szeged, Hungary. HRB-Nr./Commercial Registery No.:
06-09-010204. Umsatzsteuer-Id/VAT registration number: HU 13592417.
Geschftsfhrer/Managing Directors: Borbala Gerhardt, Szilvia Toth
Kontakt in Deutschland: +49-177-757 8658, Orplidstr. 17, 70597 Stuttgart