When duplicating test case with requirement traceability to another project, "No" new requirement traceability can be created. Is it working as design ?
Dear All (RQM Dev Team),
Let's say I have RRC req to RQM test case traceability in Project A. And when I duplicate the RQM Test case to Project B, "No" new requirement traceability can be created for test case in Project B.
Is this working as design ? Should I raise an enhancement request on this ?
Thanks in advance,
|
Accepted answer
The forward links should be copied. There was an issue with copying the backlinks, which was addressed in RQM 4.0.1(see Provide backlink status in traceability view (54955)). You should be able to manually create forward/back links for the copied test case.
yk wu selected this answer as the correct answer
|
2 other answers
Hi yk,
does the "Project B" associated with the same rm project area as "Project A"? |
yes, "Project B" associates with the same rm project area as "Project A".
|
Your answer
Dashboards and work items are no longer publicly available, so some links may be invalid. We now provide similar information through other means. Learn more here.