When duplicating test case with requirement traceability to another project, "No" new requirement traceability can be created. Is it working as design ?
Dear All (RQM Dev Team),
Let's say I have RRC req to RQM test case traceability in Project A. And when I duplicate the RQM Test case to Project B, "No" new requirement traceability can be created for test case in Project B.
Is this working as design ? Should I raise an enhancement request on this ?
Thanks in advance,
Accepted answer
The forward links should be copied. There was an issue with copying the backlinks, which was addressed in RQM 4.0.1(see Provide backlink status in traceability view (54955)). You should be able to manually create forward/back links for the copied test case.