Choose which workspace to apply patch to

I am merging changesets between streams using the Eclipse Client. I changed the flow target and accepted a changeset which resulted in a patch being created under Pending Patches. So far so good.
Now I want to apply the patch to get a set of unresolved changes that I can check in as a new changeset. The problem is that I can't seem to choose which workspace to apply the patch to. If I choose merge into workspace on the patch it always picks the bottom workspace in the list.
I'm using:
Version: 3.0.1.3
Build id: RTC-I20120326-1442
Can anyone help? It would be much appreciated!
James Clarke
Ericsson
Now I want to apply the patch to get a set of unresolved changes that I can check in as a new changeset. The problem is that I can't seem to choose which workspace to apply the patch to. If I choose merge into workspace on the patch it always picks the bottom workspace in the list.
I'm using:
Version: 3.0.1.3
Build id: RTC-I20120326-1442
Can anyone help? It would be much appreciated!
James Clarke
Ericsson
2 answers

This is a known limitation/problem, the following enhancement request exists to address it:
114503: Support applying patches when the client has two workspaces with same content loaded
As you have found, the problem can be resolved by only ever having one repository workspace loaded at a time.
114503: Support applying patches when the client has two workspaces with same content loaded
As you have found, the problem can be resolved by only ever having one repository workspace loaded at a time.