How to import RPT result back to RQM?
Hi
We have RPT and RQM integrated, RPT schedules are run from within RQM so the result can be reported by RQM reports, such as TER status, etc.
In case RQM is down, we can run the schedule directly from RPT, but after that, how the result can be imported or link back to RQM so the result will be included in RQM report?
Thanks
Jirong
We have RPT and RQM integrated, RPT schedules are run from within RQM so the result can be reported by RQM reports, such as TER status, etc.
In case RQM is down, we can run the schedule directly from RPT, but after that, how the result can be imported or link back to RQM so the result will be included in RQM report?
Thanks
Jirong
2 answers
Hi
We have RPT and RQM integrated, RPT schedules are run from within RQM so the result can be reported by RQM reports, such as TER status, etc.
In case RQM is down, we can run the schedule directly from RPT, but after that, how the result can be imported or link back to RQM so the result will be included in RQM report?
Thanks
Jirong
OK, seems no way.
http://jazz.net/forums/viewtopic.php?t=10021
Hi
We have RPT and RQM integrated, RPT schedules are run from within RQM so the result can be reported by RQM reports, such as TER status, etc.
In case RQM is down, we can run the schedule directly from RPT, but after that, how the result can be imported or link back to RQM so the result will be included in RQM report?
Thanks
Jirong
OK, seems no way.
http://jazz.net/forums/viewtopic.php?t=10021
The workaround in that forum post is the way. It's just not as easy as some would like, but you should still be able to accomplish your goal of getting the RPT results back into RQM and reporting on them.