How to import RPT result back to RQM?


Jirong Hu (1.5k9295258) | asked May 31 '11, 2:33 p.m.
Hi

We have RPT and RQM integrated, RPT schedules are run from within RQM so the result can be reported by RQM reports, such as TER status, etc.

In case RQM is down, we can run the schedule directly from RPT, but after that, how the result can be imported or link back to RQM so the result will be included in RQM report?

Thanks
Jirong

2 answers



permanent link
Jirong Hu (1.5k9295258) | answered May 31 '11, 3:14 p.m.
Hi

We have RPT and RQM integrated, RPT schedules are run from within RQM so the result can be reported by RQM reports, such as TER status, etc.

In case RQM is down, we can run the schedule directly from RPT, but after that, how the result can be imported or link back to RQM so the result will be included in RQM report?

Thanks
Jirong


OK, seems no way.

http://jazz.net/forums/viewtopic.php?t=10021

permanent link
Kurtis Martin (1.4k11) | answered May 31 '11, 3:29 p.m.
JAZZ DEVELOPER
Hi

We have RPT and RQM integrated, RPT schedules are run from within RQM so the result can be reported by RQM reports, such as TER status, etc.

In case RQM is down, we can run the schedule directly from RPT, but after that, how the result can be imported or link back to RQM so the result will be included in RQM report?

Thanks
Jirong


OK, seems no way.

http://jazz.net/forums/viewtopic.php?t=10021

The workaround in that forum post is the way. It's just not as easy as some would like, but you should still be able to accomplish your goal of getting the RPT results back into RQM and reporting on them.