Hi,

I have a customer that is currently using RequisitePro, ClearQuest and
TEst Manager, including traceability links between them.

They would like to migrate to RQM and RTC (and evaluating in the future
the migration from REqPro to RRC if it has the functionality required).

The first phase of the migration will be RqM but they don't want to
loose traceability links already implemented in classical Rational tools.

So the Test MAnager to RQM migrator:

* Will also migrate links between Test Manager and CQ? So users can
also have these existing traceability links with CQ when using RQM and
the CQ connector?

* Will also migrate links between Test MAnager and RequisitePro? So
users can also have the existing traceability links with RequisitePro
when using RQM and RequisitePro out of the box integration?.

Many thanks,

Ana

One answer



permanent link
Paul Slauenwhite (8.4k12) | answered Jul 08 '14, 10:25 a.m.
FORUM MODERATOR / JAZZ DEVELOPER
If this is still reproducible, please upgrade RQM (https://jazz.net/downloads/rational-quality-manager/) and retry this scenario.  If the symptom is still reproducible, please open a PMR (see http://www-01.ibm.com/support/docview.wss?uid=swg21507639).