Insight/RCR configure multiple RQM data sources supported?
Hi,
I have read the article about Insight and RQM on developerworks. http://www.ibm.com/developerworks/rational/library/10/insight-metrics-and-reports-for-quality-manager-part1/index.html but it is not described how to report over multiple RQM project areas. What I have done: Starting Point: RCR and RQM 2.0.1ifix05 configured and working (both ETL and live DS) 1. created a new project area in RQM "A" 2. configured new Ressource Group A in XML Data Configuration for for live and DW config. 3. created 2 ODBC connections for A and A live 4. for the RQM and RQM (ETL) DS in Cognos Administartion I added a 2. connection to A and A live ODBC DS. 5. I run the ETL job and testet to access the live DS as well Q1: I can access the data of both project areas. Is this the way how to do this right? Q2: Do I have to set/unset "Link to existing ressource group" in XML Data Configuration dialog? Thanks in advance and best Regards, Ren |
One answer
Hi Rene,
A1: It sounds like you're on the right track. You need to treat the two RQM data sources as just that, two distinct data sources. A2: As far as I know you do not need to make any changes to the XDC file. Simply having a copy for each data source should be sufficient. |
Your answer
Dashboards and work items are no longer publicly available, so some links may be invalid. We now provide similar information through other means. Learn more here.