It's all about the answers!

Ask a question

Insight/RCR configure multiple RQM data sources supported?


Rene Meyer (42913334) | asked Nov 10 '10, 8:55 a.m.
JAZZ DEVELOPER
Hi,

I have read the article about Insight and RQM on developerworks.
http://www.ibm.com/developerworks/rational/library/10/insight-metrics-and-reports-for-quality-manager-part1/index.html
but it is not described how to report over multiple RQM project areas.
What I have done:
Starting Point:
RCR and RQM 2.0.1ifix05 configured and working (both ETL and live DS)
1. created a new project area in RQM "A"
2. configured new Ressource Group A in XML Data Configuration for for live and DW config.
3. created 2 ODBC connections for A and A live
4. for the RQM and RQM (ETL) DS in Cognos Administartion I added a 2. connection to A and A live ODBC DS.
5. I run the ETL job and testet to access the live DS as well

Q1: I can access the data of both project areas. Is this the way how to do this right?
Q2: Do I have to set/unset "Link to existing ressource group" in XML Data Configuration dialog?

Thanks in advance and best Regards,
Ren

One answer



permanent link
Lawrence Mandel (51121) | answered Nov 10 '10, 11:55 a.m.
FORUM MODERATOR
Hi Rene,

A1: It sounds like you're on the right track. You need to treat the two RQM data sources as just that, two distinct data sources.
A2: As far as I know you do not need to make any changes to the XDC file. Simply having a copy for each data source should be sufficient.

Your answer


Register or to post your answer.


Dashboards and work items are no longer publicly available, so some links may be invalid. We now provide similar information through other means. Learn more here.