new WI type - points doesn't shown
hello,
I defined a new WI type I called it "enabler".
I copied all fields from the story type since "enabler" and "story" are the same. (except the ID of course)
but when I create a WI type of "enabler" and other are "story" the process adds up only the story points and not the "enabler" points.
is there a way to make the "enabler" WI type to be also add up with its points like the story type?
thanks,
Accepted answer
As far as I can tell, the work item at least
- Has to reuse the story point attribute used for the story points (the very same attribute with the same attribute ID)
- Must be selected as a plan item in the Eclipse client Process Configuration>Configuration>Project Configuration>Configuration Data>Planning>Work Item Type Categorization.