Use "Check-in and deliver" with work item from different project area
![](http://jazz.net/_images/myphoto/f8f878790cdfa625f92e776441b94daa.jpg)
It seems like to associate a work item from a different project area I have to create a change set manually first, then associate a work item and then deliver the whole things.
If I choose "check-in and deliver" I get a different dialog than the one when I choose "associate work item" because the project area dropdown is missing.
Is there a fix for this?
If I choose "check-in and deliver" I get a different dialog than the one when I choose "associate work item" because the project area dropdown is missing.
Is there a fix for this?