Is there a way to change DCC default "Delta load since previous run" to "Delta load since date", for example?
DCC Load Types: Full load, load since previous run, Delta load since date.
Full loads occur during the initial run of the data collection jobs, which builds all the data warehouse tables from scratch. These jobs take longer than typical data collection jobs that run delta builds, which only collect changes from the last time the job ran or a specified date. Any subsequent loads after the initial load or after running a job with a changed load type configuration, automatically defaults back to the Delta load since previous run setting. If I manually changed some DCC jobs to run "Delta load since date" and specified a "Date", Is there a way to make subsequent load still "Delta load since date" of previously selected "Date"? Thank you. |
Be the first one to answer this question!
Dashboards and work items are no longer publicly available, so some links may be invalid. We now provide similar information through other means. Learn more here.