Receiving error "the iteration is not from the same project as the work item" when trying to save work item
I have 4 DR projects that are using another DR projects template to configuration. Most of the configuration is inherited from this project, but for creating timelines I created then in each project. In the DR project template I have a default value script that defaults "DR Backlog" in the "Planned For" field. For each project it defaults "DR Backlog" for the "Planned for". 3 of the projects I get the error above, but one DR project I do not. For each DR project I created the timelines/iterations in each project so I am not sure what the difference is between the 3 DR projects that are getting the error and the one DR project that is not.
Any idea what may be causing this error?
Thank You