how to delete milestones


yu wang (48816245) | asked Jan 29 '08, 4:59 a.m.
I delete some milestones ,but they can be displayed.
I hope they can't be displayed .how to do?

5 answers



permanent link
yu wang (48816245) | answered Jan 29 '08, 5:22 a.m.
I mean they can't be displayed on overview view of project area.

permanent link
Darin Swanson (3161) | answered Jan 29 '08, 1:08 p.m.
On the Overview page of the Project Area editor, within the Process
Iterations section you can filter the tree to display archived milestones.

In the toolbar of the Iterations section, the filter action is the first
button on the left.

HTH
Darins
Jazz Process Team

"openeis" <wangwyu@cn.ibm-dot-com.no-spam.invalid> wrote in message
news:fnmv3i$nch$1@localhost.localdomain...
I mean they can't be displayed on overview view of project area.

permanent link
yu wang (48816245) | answered Jan 29 '08, 10:06 p.m.
Thanks a lot.
I have another question.
In process iteration setion of project area overview tab,
My project have a following milestone:
trixxxx
M1FEP1
M2FEP2
M3FEP3
3.0.0.0
3.0.1.0
PASS1
PASS2(blue)
GMV


but in plan item (work item) record ,PASS1/PASS2/GMV can't be displayed in "planed for".

permanent link
yu wang (48816245) | answered Jan 30 '08, 2:42 a.m.
trixxxx (level 1)
M1FEP1 (level 2)
M2FEP2 (level 2)
M3FEP3 (level 2)
3.0.0.0 (level 3)
3.0.1.0 (level 3)
PASS1 (level 4)
PASS2(blue) (level 4)
GMV (level 4)

permanent link
Christof Marti (681) | answered Jan 30 '08, 4:08 a.m.
I assume "trixxxx" is the development line? In Beta2 we only allow the first two levels of iterations for Planned For, this will become configurable with 0.6M5 where you can decide for each iteration if it should be available for the Planned For field of work items.

Regards,

Christof
Jazz Work Item team

openeis wrote:
Thanks a lot.
I have another question.
In process iteration setion of project area overview tab,
My project have a following milestone:
trixxxx
M1FEP1
M2FEP2
M3FEP3
3.0.0.0
3.0.1.0
PASS1
PASS2(blue)
GMV


but in plan item (work item) record ,PASS1/PASS2/GMV can't be
displayed in "planed for".

Your answer


Register or to post your answer.