Hi Guido,
I have to apologize, I have not yet formally documented the 6.0.3 > 6.0.4 SAFe template deltas in a concise way. I suppose since I'm including a list here, I may as well just do it :) The SAFe 4.5 Configuration Guidelines do include information about how to configure the 6.0.3 > 6.0.4 deltas (just combined with all of the other 4.5 changes). Here's the basic list, then you can look in those guidelines:
RTC:
-
Fix issue with VSE and Program Epic "Approved" state, should be in Analysis State Group
-
Add permission to Release Train Engineer to update project areasĀ
-
Add Stretch (Boolean) attribute to PI Objective
-
Add Learning Milestone work item type to Program level
-
Add MVP (Boolean) to Capability, Feature, Story
RDNG:
-
Set initial values for the Capacity and Investment attributes in RDNG
-
Update descriptions for the Capacity and Investment attributes in RDNG (they used to be on Strategic Theme, they are now on Value Stream and Program)
-
Update preferred link types based on revised domain model
-
Add the Type Description hyperlink to content for RDNG artifacts, like we have for RTC work item types
Amy