Is it possible to integrate ClearCase 7.1.1 UCM activities with RTC 4.0.3
I have a customer running ClearCase 7.1.1 UCM and RTC 4.0.3. They want to link CC activies with RTC work items (possibly tasks). Is this possible?
Most searches come back with results that says CCRC 7.1.x and RTC 2.x or RTC 3.x, or CCRC 8.x and RTC 4.x.
Also is there a set of documentation that can help me produce an end to end story. A lot of the documentation available is rather fragmented and I cannot find out how everything fits together.
Many thanks
Most searches come back with results that says CCRC 7.1.x and RTC 2.x or RTC 3.x, or CCRC 8.x and RTC 4.x.
Also is there a set of documentation that can help me produce an end to end story. A lot of the documentation available is rather fragmented and I cannot find out how everything fits together.
Many thanks
Accepted answer
This page can also tell you version compatibility :
https://pic.dhe.ibm.com/infocenter/clmhelp/v4r0m3/topic/com.ibm.team.connector.scm.cc.doc/topics/r_relnotes_bridge.html
I think the combination of CCRC 7.1.1 and RTC 4.0.3 would work for UCM.
https://pic.dhe.ibm.com/infocenter/clmhelp/v4r0m3/topic/com.ibm.team.connector.scm.cc.doc/topics/r_relnotes_bridge.html
I think the combination of CCRC 7.1.1 and RTC 4.0.3 would work for UCM.
One other answer
I Haven't tried it with CC 7.1.1, however I remember it worked for me with CC 7.1.2 and RTC 4.0.1 (and CC 8.0 and RTC 4.0.1)
I used this one: https://jazz.net/library/article/813/
Regards,
Tamir Gefen, GoMidjets