CLM level project timeplan
Hi all,
I am novice in this forum so if the same question has already been asked before I apologize. I have been trying to create a project in 3.0.1. release Sandbox. I have not managed to generate a Master time plan that I could inherit to the other tools (RRC, RQM, RTC). Is this possible to do or do I need to either create copies or try to work around it outside the CLM? With best regards Erkki Karaharju |
One answer
Geoffrey Clemm (30.1k●3●30●35)
| answered Jul 21 '11, 5:35 p.m.
FORUM ADMINISTRATOR / FORUM MODERATOR / JAZZ DEVELOPER
I believe that your only option is to create a separate timeline for RTC
and RQM, and manually keep them in sync. I've submitted work item 172120 to ask for a single shared timeline. Cheers, Geoff On 7/20/2011 4:08 AM, ekarah wrote: Hi all, |