Show "time remaining" in My Work?
But, is there some way to get the "time remaining" rather than the "estimate" being shown in the "main view". I know that I can get the information by Show Work Time but this an extra step. Besides, what I care about is the amount of work left, not the original estimate.
/Roger
2 answers
Comments
Do you mean something like this: https://jazz.net/jazz/web/projects/Rational%20Team%20Concert#action=com.ibm.team.workitem.viewWorkItem&id=84750 ?
Possibly, hard to say. In somy lousy ascii art, what I would like is that the "2h" in Time Remaining below should be shown in the first line, rather than the "4h"
SomeTask 4h 123
Minimal ---- Nominal 4h
Maximal ---- Time Remaining 2h
In other words, what I want see, by default, in My Work is the work that I have left to do, not what it originally was.
/Roger
Greeting,
Christoph
Comments
Do you mean something like that? https://jazz.net/forums/viewtopic.php?p=16455&sid=b244eaefc098f9db51b88e0fdd6e31b6#16455%20%C2%A0
Greeting,
Christoph
Unfortunately no. We already use the time remaining mode so this is not the problem.
The problem is that the default cost information per item I see in my "My Work" view is the Estimate (or Correction if this is set). I would like to, by default, see the remaining time.
Assume I have an item 123 with an Estimate of 16h. I have worked diligently on this and the remaining time is 1h and this is stated in the Time Remaining field. However in "My Work" the default time information for 123 is shown as 16h which is irrelevant (at least in the time remaining mode). To get the the time remaining info (= "1h") I have to execute the "Show Work Time" operation on the item.
/Roger